ElectroGuard Modernization

Increased uptime achieved by migrating from an antiquated hard-wired safety solution to a programmable safety controller-based system

Project Overview:

ROSS Controls acquired the ElectroGuard product line and contacted us to help with modernization efforts due to obsolescence issues with several of the components that make up the control module for these systems. In addition, a customer with one of the largest installations of ElectroGuard, Kimberly Clark, was experiencing lengthy downtime issues with their existing systems due to hardwired safety circuits that were difficult to troubleshoot. Opus Integration worked with ROSS Controls and Kimberly Clark to develop a new control module that utilizes a programmable safety controller and operator interface to replace the obsolete safety components.

At-A-Glance:

Industry:
Location: Various

The Client's Challenge

  • Product Obsolescence
  • Lengthy Downtime Events
  • Complex Troubleshooting

The Opus Solution

Redesign control module to utilize programmable safety controller-based solution:

  • Replace all legacy / obsolete components
  • Provide backward compatibility for existing ElectroGuard installations
  • Enhanced diagnostics via operator interface to minimize the amount of occurrences / reduce the length of future downtime events